JORDAN UNIVERSITY OF SCIENCE & TECHNOLOGY CENTRAL LIBRARY

Client: Jordan University of Science & Technology
Location: Irbid – Jordan
Services Provided: Design & Supervision
Total Built-up Area: 31,655 sq.m
Construction Cost: US $ 21,580,000
Starting Date: 1999 Design – 2003 Supervision
Completion Date: 2000 Design – 2006 Supervision

About
THE PROJECT

Through the use of expressive elements, materials and details that are blended within the culture of the place, Jordan University of Science and Technology Central Library was part of the first phase of the master plan for the University’s vital social spine, with its architectural building design that serves as a hub for knowledge containing bibliographic, audio and visual materials, in addition to electronic information all under one roof.

Equipped with up-to-date facilities that are able to meet future demands, the library can hold 300,000 stacks of volumes and 2,500 seats, in addition to lecture and exhibition halls along with seminar rooms that are built in a separate but integral building, forming two quadrants of the central forum.